[1]
Mao, T. 2025. A Review of Scheduling Methods for Multi-AGV Material Handling Systems in Mixed-Model Assembly Workshops. Frontiers in Sustainable Development. 5, 3 (Mar. 2025), 227–237. DOI:https://doi.org/10.54691/p4x5a536.